Intel® Quartus® Prime Standard Edition User Guide: Design Optimization

ID 683230
Date 11/12/2018
Public
Document Table of Contents

7.10. Engineering Change Orders with the Chip Planner Revision History

Document Version Intel® Quartus® Prime Version Changes
2018.09.24 18.1.0 Initial release in Intel Quartus Prime Standard Edition User Guide.
2018.05.07 18.0.0 Added statement indicating no Chip Planner ECO support for Intel Arria 10 devices.
2015.11.02 15.1.0 Changed instances of Quartus II to Quartus Prime.
June 2014 14.0.0
  • Updated formatting.
  • Removed references to Stratix, Stratix II, Stratix III, Arria GX, Arria II GX, Cyclone, Cyclone II, Cyclone III, and MAX II devices.
  • Added MAX V, Cyclone V, Arria V I/O elements
June 2012 12.0.0 Removed survey link.
November 2011 10.1.1 Template update.
December 2010 10.1.0
  • Updated chapter to new template
  • Removed “The Chip Planner FloorPlan Views” section
  • Combined “Creating Atoms”, “Deleting Atoms”, and “Moving Atoms” sections, and linked to Help.
  • Added Stratix V I/O elements in “FPGA I/O Elements”.
July 2010 10.0.0
  • Added information to page 17–1.
  • Added information to “Engineering Change Orders” on page 17–2.
  • Changed heading from “Performance” to “Performance Preservation” on page 7–2.
  • Updated information in “Performance Preservation” on page 17–2.
  • Changed heading from “Documentation” to “Change Modification Record” on page 17–3.
  • Changed heading from “Resource Property Editor” to “Performing ECOs in the Resource Property Editor” on page 17–15.
  • Removed “Using Incremental Compilation in the ECO Flow” section. Preservation support for ECOs with the incremental compilation flow has been removed in the Quartus II software version 10.0.
  • Removed “Referenced Documents” section.
November 2009 9.1.0
  • Updated device support list
  • Made minor editorial updates
March 2009 9.0.0
  • Updated Figure 17–17.
  • Made minor editorial updates.
  • Chapter 15 was previously Chapter 13 in the 8.1.0 release.
November 2008 8.1.0
  • Corrected preservation attributes for ECOs in the section “Using Incremental Compilation in the ECO Flow” on page15–32.
  • Minor editorial updates.
  • Changed to 8½” x 11” page size.
May 2008 8.0.0
  • Updated device support list
  • Modified description for ECO support for block RAMs and DSP blocks
  • Corrected Stratix PLL ECO example
  • Added an application example to show modifying the connectivity between resource atoms